What is a Party Wall Notice — and Do I Need to Serve One?

Writer: Canonbury
Canonbury
Sep 23
3 min read

Updated: Nov 4

Planning building works? You may need to serve a Party Wall Notice before you start. Find out what it is, when it applies and what happens if you get it wrong.


The Party Wall etc. Act 1996 affects far more homeowners than realise it. If you are planning building works — a rear extension, a loft conversion, a basement, or even work to a shared chimney breast — there is a good chance the Act applies to you.

Getting it wrong can mean injunctions, delays, legal costs and neighbour disputes that far outweigh the cost of doing things properly from the start.


What is the Party Wall Act?

The Party Wall etc. Act 1996 is legislation covering England and Wales that governs certain types of building work affecting shared walls, boundary structures and excavation close to neighbouring properties.

It does not prevent you from carrying out works. It creates a framework that protects both you and your neighbours — ensuring that risks are recorded, disputes are resolved through a structured process, and nobody is left without recourse if something goes wrong.


When do I need to serve a Party Wall Notice?

The Act applies to three main categories of work:

Work to a party wall or shared structureThis includes inserting steel beams, removing chimney breasts, raising or underpinning a wall, or cutting into a party wall. Loft conversions frequently fall into this category because steel beams are typically built into the shared party wall.


New building at or on the boundaryIf you plan to build a new wall at or near the boundary between properties — as commonly happens with rear extensions — the Act applies.


Excavation close to a neighbouring structureThe Act applies if you excavate within 3 metres of a neighbouring structure and deeper than its foundations, or within 6 metres in certain deeper excavation scenarios. Basement projects almost always trigger this provision.


What happens if I don't serve notice?

If you carry out notifiable works without serving notice your neighbour can apply to the court for an injunction to halt the works. You may also face liability for any damage caused without the protection of a Party Wall Award.

The cost of resolving a dispute after the fact is almost always significantly greater than the cost of getting the process right from the start.


How do I serve a Party Wall Notice?

A Party Wall Notice is a formal written document served on your adjoining owner before works begin. It must include your name and address, the address of the property, a clear description of the proposed works and the intended start date.

There are different notice types depending on the works involved, and different notice periods — typically one or two months before works begin. Serving the wrong notice, or serving it incorrectly, can mean the entire process has to start again.


What happens after I serve notice?

Your neighbour has 14 days to respond. They can consent — in which case the process ends there for that notice — or dissent, in which case a surveyor or surveyors are appointed to resolve the matter by Party Wall Award.

If your neighbour fails to respond within 14 days they are deemed to have dissented and a surveyor must be appointed.


How Carrington can help

Carrington Building Consultancy advises building owners and adjoining owners on party wall matters across London and the South East. Whether you need notices drafted and served, a surveyor appointed to act in your interests, or simply want to understand your position before works begin — we can help.


 
 
 