Level 2 or Level 3 survey: which one do you need?

Surveys are sold in levels, and the names don't explain much. If you are buying a home, the choice usually comes down to Level 2 or Level 3. The right answer depends less on the price of the property than on its age, its construction and what you plan to do with it.
What the levels mean
The levels come from the RICS Home Survey Standard, which sets out what each type of residential survey should cover. Level 1 is a basic condition report. Most buyers are choosing between the two above it.
Level 2 suits conventional, reasonably modern homes in fair condition. The surveyor inspects what is visible and accessible, flags defects and gives each part of the building a condition rating.
Level 3 is the most thorough. It takes longer on site and goes further on the report: how the building is put together, the likely cause of defects, how they might develop and what to do about them.
When Level 2 is usually enough
The property was built in the last few decades, using standard construction
It looks to be in reasonable repair
It hasn't been heavily extended or altered
You aren't planning major works
When to choose Level 3
The property is Victorian, Edwardian or older
It has been extended, converted or had walls removed
You can already see cracks, damp or a tired roof
It is listed, of unusual construction or thatched
You plan to renovate, extend or convert the loft
In London this covers a large share of the housing stock. Terraces of 100 years or more have solid walls, shallow foundations and a century of alterations, some of them good and some less so. A survey that only records what is visible may leave you with questions a Level 3 would have answered.
Does a higher level mean a better inspection?
Neither level involves lifting floorboards or opening up walls without permission, and neither is a guarantee that nothing is wrong. The difference is in the time spent and the depth of the advice. Both should also tell you what the surveyor could not see, and that part of a report matters more than people tend to think.
What about the cost?
A Level 3 survey costs more than a Level 2, and the gap is usually small next to the cost of one unexpected repair. A roof, a damp problem or a structural issue found after you exchange is yours to pay for. Found before, it can be used in your negotiation.
Not sure which you need?
Send us the listing before you book anything. Canonbury Building Consultancy carries out building surveys across London and the South East, and we'll tell you which level suits the property, even if the answer is the cheaper one.
This article is general guidance, not advice on a specific property.




Comments